In the construction project “Am Lokdepot” the HD Group sold the last of 40 residential units with the purchase agreement signed on 27 October 2017. The high-quality equipped 1- to 4-room apartments with sizes from 40 sqm to 200 sqm containing balconies or roof terraces are due to floor-to-ceiling windows very well exposed. In the basement of the building there are 125 car parking spaces of which only a few are left. The building meets the requirements of the current EnEv and receives a roof greening. Completion is scheduled for summer 2018.